Industrial Machinery Archives - Ä¢¹½ÊÓÆµ /case_study_category/industrial-machinery/ Motion Control and Fluid Handling Solution Experts Tue, 06 Sep 2022 08:18:10 +0000 en-US hourly 1 https://wordpress.org/?v=7.0.2 /wp-content/uploads/2020/04/cropped-rg-favicon-2-32x32.png Industrial Machinery Archives - Ä¢¹½ÊÓÆµ /case_study_category/industrial-machinery/ 32 32 Pharmaceutical OEM /case-study/pharmaceutical-oem/ Tue, 06 Sep 2022 08:18:10 +0000 /?post_type=case-study&p=9558 Opportunity: Design, build and commission an automated testing system to verify the integrity of a high cost medical component for the end-user.

Result: Ä¢¹½ÊÓÆµ designed, built and commissioned a custom control system. The system consists of a stand alone pressure control system that offers the flexibility as an upgrade option to existing OEM products. The system can also be used as a demonstration, training and troubleshooting unit.

The Ä¢¹½ÊÓÆµ Advantage: Ä¢¹½ÊÓÆµ helped this customer gain multiple advantages over the competition by producing a product that can be sold by itself or as an upgrade to their existing products. This product provided an advantage for all departments within OEM company. From the purchasing department through engineering, field service, sales and management, this OEM could realize a quick and sizeable return on investment.

]]>
Large Research University /case-study/large-research-university/ Tue, 06 Sep 2022 08:16:44 +0000 /?post_type=case-study&p=9556 Opportunity: Design, build and install a central hydraulic system in a state-of-the-art testing facility.

Result: Ä¢¹½ÊÓÆµ built the massive 375 hp, 500 gallon hydraulic power unit and installed in excess of 2500 feet of stainless steel pipe and tube in support of this state-of-the-art facility. Construction of the power unit began in our facility in York, PA in September of 2010. The entire piping system was designed, fabricated and laid out in our York facility prior to site work beginning in April 2011. Installation, commissioning and successful turnover of the system was complete by July 2011.

The Ä¢¹½ÊÓÆµ Advantage: The engineering firm with primary responsibility to deliver the facility received regular schedule and cost updates, anticipated progress billings, and an effortless transition after commissioning. A comprehensive package of technical information accompanied the system to include: Operation and Maintenance manuals, as-built drawings, schematics and component data sheets.

]]>
Large OEM /case-study/large-oem/ Tue, 06 Sep 2022 08:15:55 +0000 /?post_type=case-study&p=9554 Opportunity: Design, build and install a central hydraulic system in a state-of-the-art testing facility.

Result: Design and build diesel engine driven hydraulic power units to power motorized hose reels for fire-fighting use.

The Ä¢¹½ÊÓÆµ Advantage: Ä¢¹½ÊÓÆµ built and delivered 35 hydraulic power units. Construction of the power units began in our facility in York, PA in August of 2008, with the final unit being delivered in December of 2008.

Advantage: Not only did Ä¢¹½ÊÓÆµ meet the customer’s requirements but the team installed the HPU in a tight deadline of a one week timeframe to prevent a delay with on-coming construction companies on site.

]]>